Repositório UNIFEI UNIFEI - Campus 1: Itajubá PPG - Programas de Pós Graduação Dissertações
Use este identificador para citar ou linkar para este item: https://repositorio.unifei.edu.br/jspui/handle/123456789/4033
Tipo: Dissertação
Título: Análise do impacto das incertezas hidrológicas na garantia física da geração hidrelétrica de pequenas centrais hidrelétricas
Autor(es): ALFAICA, Ajumar Omar
Primeiro Orientador: BARROS, Regina Mambeli
metadata.dc.contributor.advisor-co1: TIAGO FILHO, Geraldo Lúcio
Resumo: As Pequenas Centrais Hidrelétricas (PCHs) correspondem a 3,3 % da matriz elétrica brasileira e tem ganhado mercado devido aos seus menores impactos ambientais quando comparadas com Usinas Hidrelétricas. A sua energia é comercializada por meio da Garantia Física (GF), que é a máxima quantidade de energia que o gerador pode comercializar. O valor da GF é calculado utilizando séries de vazões médias mensais, porém estudos mostram que o emprego destas séries superestima a GF, que séries de vazões médias diárias apresentam maior proximidade com a energia elétrica gerada. Diferente de outras finalidades hidrológicas, no cálculo da GF de PCHs não são abordados ou quantificados os níveis de incertezas dos dados. Diante deste contexto, a pesquisa analisou o impacto de incertezas hidrológicas na GF de geração hidrelétrica de PCHs, onde estudou-se o método Monte Carlo para a análise de incertezas das PCHs estudo-de-caso. A partir do modelo de previsão elaborado e utilizado na simulação de Monte Carlo, verificou-se que a GF nos cenários otimistas e pessimistas apresentou-se superior ao vigente, e através da análise de dispersão observou-se que empreendimentos de menores potências instaladas e menores GF possuem um maior risco atrelado de negócio, diferente de PCHs com maiores GF, cujos estudos hidrológicos e de confiabilidade de geração geralmente passam por avaliações mais criteriosas pelos investidores. Verificou-se que como a adesão das PCHs ao Mecanismo de Realocação de Energia (MRE) é facultativa, a análise das margens de incerteza da GF permitem ao gerador ter um mecanismo a mais de análise e tomada de decisão quanto a adesão ou não ao MRE. Dotado das margens de incerteza é possível comparar se o valor atribuído pelo Ministério de Minas e Energia se encontra dentro das margens delimitadas, assim como permitirá ao empreendedor avaliar em termos probabilísticos as condições reais de geração da sua usina e os riscos a serem enfrentados em termos de comercialização de energia.
Abstract: Small Hydroelectric Plants (SHPs) make up 3.3% of the Brazilian electricity grid, and are becoming more popular given their lower environmental impacts compared to larger hydroelectric plants. The energy generated by SHPs is sold using a Physical Energy Guarantee, also known as a Power Purchase Agreement (PPA), which is the maximum amount of energy that a generator can sell. The PPA is calculated based on monthly average flow series data, however, studies have shown that this can overestimate the PPA, and that daily average flow series data are more accurate in reflecting the amount of generated electric energy. Unlike other hydrological evaluations, the uncertainty levels associated with the data used to calculate the PPA at SHPs are neither considered nor quantified. This study investigates the impact of hydrological uncertainties on SHP PPAs. The Monte Carlo method was used to analyze the uncertainty levels for an SHP case-study. The results showed that the PPA, in optimistic and pessimistic scenarios, was higher than the current PPA. Dispersion analysis revealed that SHPs with smaller installed capacities and lower PPAs faced more business risks, compared to SHPs with higher PPAs, which are generally more thoroughly evaluated by investors. It was verified that once the adhesion of the SHPs to the Energy Reallocation Mechanism (ERM) is optional, the analysis of the uncertainty margins of the PPA has the possibility of allowing the generator to have an additional mechanism for analysis and decision making regarding the adhesion or not to the ERM. With the uncertainty margins it is possible to compare if the value attributed by the Ministry of Mines and Energy is within the delimited margins, as well as allow the entrepreneur to evaluate in probabilistic terms the real generation conditions of its plant and the risks to be faced in terms of energy trading.
Palavras-chave: Pequenas centrais hidrelétricas
Garantia física
Incerteza hidrológica
Monte Carlo
CNPq: CNPQ::ENGENHARIAS::ENGENHARIA MECÂNICA::ENGENHARIA DE ENERGIA
Idioma: por
País: Brasil
Editor: Universidade Federal de Itajubá
Sigla da Instituição: UNIFEI
metadata.dc.publisher.department: IEM - Instituto de Engenharia Mecânica
metadata.dc.publisher.program: Programa de Pós-Graduação: Mestrado - Engenharia de Energia
Tipo de Acesso: Acesso Aberto
URI: https://repositorio.unifei.edu.br/jspui/handle/123456789/4033
Data do documento: 24-Mai-2023
Aparece nas coleções:Dissertações

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
Dissertação_2024050.pdf2,14 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.