Resumo:
A supply contract of equipments for Small Hydro Power, contain the power and
turbine efficiency guarantees and can contain adds guarantees referring to a rotation and
pressure variation, runaway speed and cavitations test.
To the determination about the hydraulics turbines performance for contractual
guarantees are realized the field acceptance test, that are methods quite a lot used for
enterprises like tools to prove the contractual guarantees in substitution to Model Test, that
showed a cost extremely high.
In the field acceptance test are measures of some values that added to the others,
possibility obtain the turbine efficiency.
In the Small Hydro Power, the turbine efficiency represents the hydraulic power
percentage that is subject to be transformed in electrical power. In the turbine purchase, the
manufacturer has to guarantee the efficiency specified if it is become down to expected, the
damages are enormous, then the importance to exist precise methods and reliable for your
measurement.
The method accuracy of the discharge measurement that has, between another
problems, the calibration and installation, that influence hard the value of the efficiency
obtained. This work shows the different methodologies about discharge measurement in
hydraulic turbines, that can be apply in Small Hydro Power field tests and shows too the
procedures used that in specifics cases of Smal Hydro, without quality damage, the site tests
could be executed the form that the guarantees will be approve with compatible cots with the
investment done.
As an example for said above, are show two Cases in Small Hydro where did realized
field acceptance tests to assure the contractual guarantees.